Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount (.*)
    € 151,780,000
    Countries
    Sector(s)
    Bosnia and Herzegovina : € 151,780,000
    Transport : € 151,780,000
    Signature date(s)
    29/07/2020 : € 11,780,000
    27/02/2020 : € 140,000,000
    (*) Including a € 11,780,000 Investment Grants provided by the WESTERN BALKANS INVESTMENT FRAMEWORK
    Link to source
    Other links
    Summary sheet

    Summary sheet

    Release date
    10 April 2019
    Status
    Reference
    Signed | 27/02/2020
    20180270
    Project name
    Promoter - financial intermediary
    CORRIDOR VC CENTRE
    JAVNO PREDUZECE AUTOCESTE FBIH DOO
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 152 million
    EUR 294 million
    Location
    Sector(s)
    Description
    Objectives

    The project concerns the construction on a new alignment of two non-contiguous sections of Corridor VC, totaling about 12 km in aggregate, between Poprikuse-Nemila and Tacin-Ivan in central BiH.

    The project is part of Corridor Vc connecting the Croatian coast to Budapest through BiH and forms part of the South-Eastern axis of the extension of the TEN-T network to neighboring countries. The project is part of the South-East Europe Transport Observatory's (SEETO) Comprehensive Network. Both sections of the project are included in the Single Project Pipeline as priority projects on the Core TEN-T network extension to BiH. The project is prioritised within the Government of BiH's Transport Strategy 2016-2030. The project is expected to facilitate trade, develop tourism, promote regional and national economic growth and ultimately contribute to economic and social cohesion in the region.

    Environmental aspects
    Procurement

    If located within the EU, the project would fall under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU and therefore be subject to an EIA procedure. As a potential candidate country to the EU, BiH has adopted the EU Directives relevant to the ESIA process, including the EIA Directive (2014/52/EU). The entire Corridor Vc has been subject to a regulatory EIA procedure in BiH (divided in four lots with the corresponding EIAs), including public consultation at scoping and assessment stages. Environmental procedures for the two project sections are covered by the EIAs of lots 2 (section Poprikuse – Nemila) and lot 3 (section Tarcin – Ivan). Environmental permit for the entire Lot 2 was first obtained in 2010 and renewed in 2014, whilst the permit for the Lot 3 was issued in 2012 and is in the process of being renewed. There are no protected areas that would be affected by the construction of the two motorway sections of the project. There is a cultural and historical heritage site in the vicinity of the project at a distance of some 200-300 m of the motorway alignment on the Tarcin – Ivan section. A Land Acquisition and Resettlement Framework, consistent with EIB policy, was developed by the Promoter and published in 2017 for the whole Corridor Vc in BiH. The procedures and outcomes for environmental and social assessment and management are to be further reviewed during appraisal.

    The EIB will require the Promoter to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules. In particular, the Bank will require that calls for international tenders be published in the EU Official Journal, as necessary. The Bank may enter into a delegation agreement with the European Bank for Reconstruction and Development (EBRD) for all/part of the project within the context of the Procedural Framework for operations outside the EU, as foreseen in the Bank's Guide to Procurement.

    Under ELM Guarantee
    Comments

    This operation is covered by the ELM Guarantee.

    The Corridor Vc motorway connection is essential for fostering economic growth in the country. The project will substantially shorten travel distances along the central part of the corridor and is thus expected to generate substantial benefits in terms of time savings, reduced accident rates, savings in vehicle operating costs and reduction of local pollution in the towns in the area. The project will also increase accessibility and promote regional as well as local economic development. The Promoter is the Motorways Public Company of the Federation of BiH (JP Autoceste) which is responsible for the construction, operation and maintenance of motorways in the Federation. It is well known to the Bank as the promoter of a number of completed and ongoing EIB financed operations in the sector.

    Link to source
    Summary sheet

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Environmental and Social Action Plan
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    122328963
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Environmental Impact Study - Section Sarajevo South-Mostar North
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    122443529
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Non-Technical Summary (NTS) - CORRIDOR VC CENTRE
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    122524292
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Environmental Impact Study - preparation for planning and study documentation
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    121964358
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - CORRIDOR VC CENTRE
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    122443530
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Land Acquisition and Resettlement Framework
    Publication Date
    3 Sep 2019
    Document language
    Main Topic
    Lending
    Document Number
    121781947
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - CORRIDOR VC CENTRE
    Publication Date
    5 Nov 2019
    Document language
    Main Topic
    Lending
    Document Number
    93951749
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Land Acquisition and Resettlement Plan & Impact Assessment Result (LARPIAR)
    Publication Date
    6 Jul 2021
    Document language
    Main Topic
    Lending
    Document Number
    143584905
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - CORRIDOR VC CENTRE - Section Tarĉin - entrance to Tunnel Ivan
    Publication Date
    6 Jul 2021
    Document language
    Main Topic
    Lending
    Document Number
    143585392
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - CORRIDOR VC CENTRE - Land Acquisition Report - Tarcin -Tunnel Ivan
    Publication Date
    13 Jun 2022
    Document language
    Main Topic
    Lending
    Document Number
    157907323
    Document Focus
    Environmental Information
    Project Number
    20180270
    Sector(s)
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications