Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20130125
    Release date: 6 August 2013

    Promoter – Financial Intermediary

    PRIVATE COMPANY

    Location

    Description

    The project concerns the promoter’s investments in Poland to increase the availability and quality of high speed mobile broadband services based on 3G/UMTS and 4G/LTE technology.

    Objectives

    The project will provide a significantly improved coverage for 3G/UMTS based services and enable the launch of 4G/LTE based services in Poland.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 200 million

    Total cost (Approximate amount)

    EUR 512 million

    Environmental aspects

    The installation of mobile telecommunication networks does not fall under Annexes I and II of the EU Directive 2011/92/EC. they are therefore not subject to mandatory Environmental Impact Assessment. Such mobile telecommunication networks have limited residual environmental effects, apart from the visual impact of base station towers and the Electro Magnetic Field (EMF) radiation. The impacts can generally be mitigated by appropriate construction and operation measures.
    Nevertheless, the environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.
    Nevertheless, the environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.

    Procurement

    The promoter is a private company not operating in the utilities sector and not having the status of a contracting authority. Thus, it is not covered by the EU directives on procurement.

    Status

    Signed - 16/12/2013

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Poland Telecom