Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20130125
    Veröffentlichungsdatum: 6 August 2013

    Projektträger – zwischengeschaltetes Finanzinstitut

    PRIVATE COMPANY

    Ort

    Beschreibung

    The project concerns the promoter’s investments in Poland to increase the availability and quality of high speed mobile broadband services based on 3G/UMTS and 4G/LTE technology.

    Ziele

    The project will provide a significantly improved coverage for 3G/UMTS based services and enable the launch of 4G/LTE based services in Poland.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 512 million

    Umweltaspekte

    The installation of mobile telecommunication networks does not fall under Annexes I and II of the EU Directive 2011/92/EC. they are therefore not subject to mandatory Environmental Impact Assessment. Such mobile telecommunication networks have limited residual environmental effects, apart from the visual impact of base station towers and the Electro Magnetic Field (EMF) radiation. The impacts can generally be mitigated by appropriate construction and operation measures.
    Nevertheless, the environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.
    Nevertheless, the environmental details including the CO2 footprint (if needed) and the possible impacts on protected flora and fauna (Habitats 92/43/EEC and Birds 79/409/EEC Directives) will be assessed during the appraisal.

    Auftragsvergabe

    The promoter is a private company not operating in the utilities sector and not having the status of a contracting authority. Thus, it is not covered by the EU directives on procurement.

    Projektstatus

    Unterzeichnet - 16/12/2013

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Telekommunikation