corporate_banner_en

S5 EXPRESSWAY (BYDGOSZCZ-WROCLAW)

Projects
Regions
European Union
Enlargement countries
European Free Trade Association
Mediterranean Neighbourhood
FEMIP Overview
Maximizing synergies
Financing & advisory services
Loans
Private equity
Advisory services
FEMIP Support Package
Procurement for TA operations
How to apply
Trust Fund
Technical advisory
Private equity
Organisation and staff
FEMIP Internship Programme
FEMIP Secondment Programme
FAQ - FEMIP
EU Eastern Neighbours
Projects
Cooperation with other institutions and organisations
Financing facilities
Trust fund
Examples of EPTATF Operations
Institutional framework
Applying for loans
Organisation and staff
Central Asia
Institutional framework
Cooperation with other institutions and organisations
Financing facilities
Technical assistance and grants
Applying for loans
Organisation and staff
Sub-Saharan Africa, Caribbean and Pacific
Funding and Financial Instruments
Applying for loans
Cooperation with partners
Investment Facility
Other initiatives
Activities
Asia and Latin America
Priorities
SMEs
Innovative options
Loans
Microfinance
EU partners for SMEs & mid-caps
Non-EU partners for SMEs & mid-caps
RDI support
Equity investment
Regional development
Climate Action
Activities
Financial instruments and advice
Climate Mainstreaming
Urban & natural environment
Innovation
Skills and Jobs
Trans-European Networks
Transport
Energy
Project Cycle
Applying for a loan
Appraisal
Procurement
Monitoring
Projects to be Financed
Explanatory notes
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Projects Financed
Breakdown by region
European Union
EFTA countries
Enlargement Countries
Eastern Europe, Southern Caucasus and Russia
Mediterranean countries
Africa, Caribbean, Pacific countries + OCT
South Africa
Asia and Latin America
Breakdown by sector
Multi-criteria list
Operations Evaluation
Process and methodology

S5 EXPRESSWAY (BYDGOSZCZ-WROCLAW)

  •  Reference: 20120670
  •  Release date: 22 October 2013
Promoter – Financial Intermediary

MINISTRY OF TRANSPORT

Location
Description

Construction of four sections of the S5 expressway (Bydgoszcz-Poznan-Wroclaw), and one section of the S11 expressway (Poznan western bypass)

Objectives

The project is located in a Convergence region and is therefore eligible under Article 309(a). The project road is included in the current TEN-T and is proposed for inclusion in the TEN-T comprehensive (i.e. non-core) road network as part of the on-going Revision Guidelines to be approved by the Council and Parliament. The project is therefore also eligible under Article 309 (c) of the EC treaty. The project is expected to benefit from grant finance under the Operational Program Infrastructure and Environment in the next financing perspective. The consistency of the project with the policy for lending to the transport sector (Decision CA/452/11) depends on its economic profitability and will be confirmed during appraisal.

Comments
 
Sector(s)
Proposed EIB finance (Approximate amount)

PLN 2384 million (EUR 581 million)

Total cost (Approximate amount)

PLN 4768 million (EUR 1161 million)

Environmental aspects

The project falls under Annex 1 of the Environmental Impact Assessment Directive 2011/92/EU and is the subject to a full EIA procedure. The provisions of the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) apply. One section passes through N2000 areas (PLB 300017 and PLH 300010) and others pass further away. During appraisal the impact of the project on the environment will be determined.

Procurement

The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and 2007/66/EC), with publication of tender notices in the EU Official Journal, as and where appropriate.

Status

Signed   -   16/04/2014.

Related Documents
  • 22-10-2013 - Environmental Impact Assessment (EIA) - Rokietnica Swadzim PL
  • 22-10-2013 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Kaczkowo-Poznan (Głuchowo) PL
  • 22-10-2013 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Korzeńsko-Widawa PL
  • 22-10-2013 - Non Technical Summary (NTS) of the Environmental Impact Assessment (EIA) - Mielno – Gniezno PL

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The data provided on this page is therefore indicative and cannot be considered to represent official EIB policy (see also the Explanatory notes).



 Print
Copyright © European Investment Bank 2013
The European Investment Bank is not responsible for the content of external internet sites.

http://www.eib.org/projects/pipeline/2012/20120670.htm