Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20080482
    Release date: 20 October 2009

    Promoter – Financial Intermediary

    Aernnova Aerospace SAU

    Location

    Description

    Financing of an RDI programme of components for a new generation of aircraft, the development of automated manufacturing system and construction of an assembly plant.

    Objectives

    The project will contribute to increasing the promoter’s knowledge and know-how in the design, development and innovative manufacturing of lighter aircraft structures (composite), bringing about benefits through improved transportation efficiency, including environmental benefits through lower fuel consumption, mitigating the emission of CO2 and other harmful emissions. The promoter has aligned its technological programme with the ACARE (Advisory Council for Aeronautical Research in Europe) 2020 environment objectives. The technology programme is in line with EU policy on reducing pollutant emissions and will contribute to improving the competitiveness of the European aerospace industry.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to EUR 125 million.

    Total cost (Approximate amount)

    Estimated to be around EUR 234 million.

    Environmental aspects

    The research and development activities are expected to be carried out at the promoter’s existing facilities, already authorised and for which an EIA is not required. The construction of a facility for the manufacture and assembly of aircraft and its components falls under Annex II of the EIA Directive 85/337/EEC, amended by Directives 97/11/EC and 2003/35/EC. The decision made by the competent authorities for requesting (or not) an EIA on the basis of the criteria set in Annex III of the Directive and actual/possible significant impacts on protected flora and fauna (Habitats’ and Birds’ Directives) will be verified during project appraisal.

    Procurement

    Procurement is expected to be in line with EIB guidelines for private sector projects. The Bank’s services will verify details during the project’s due diligence.

    Status

    Signed - 17/12/2010

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Spain Industry