Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20060295
    Release date: 24 September 2007

    Promoter – Financial Intermediary

    Highways Agency

    Location

    Description

    The project involves widening approximately 100km of the M25 from 3 to 4 lanes and operating and maintaining the entire project road as well as a substantial portion of the existing network throughout the period of the Concession.

    Objectives

    Much of the M25 is significantly congested at peak times, during maintenance or after incidents. The proposed upgrading works aim to add new capacity and provide other improvements to the existing road network.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    Up to GBP 500 million.

    Total cost (Approximate amount)

    Approximately GBP 2 billion.

    Environmental aspects

    The planned upgrading works within the DBFO contract fall within Annex I of the Directive 85/337/EEC on environmental assessment as amended by 97/11/EC and 2003/35/EC.

    Procurement

    Procurement of the DBFO operator will be conducted in accordance with Public Works Contracts Regulations 1991 which implement the Public Works Contracts Directive 93/37/EC . Procurement will be undertaken using the restricted procedure after open tender. The contract will be awarded using the negotiated procedure as prescribed in the regulations.

    Status

    Signed - 20/05/2009

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    United Kingdom Transport