Date de publication: 24 septembre 2007
Promoteur – Intermédiaire Financier
Highways Agency
Lieu
Description
The project involves widening approximately 100km of the M25 from 3 to 4 lanes and operating and maintaining the entire project road as well as a substantial portion of the existing network throughout the period of the Concession.
Objectifs
Much of the M25 is significantly congested at peak times, during maintenance or after incidents. The proposed upgrading works aim to add new capacity and provide other improvements to the existing road network.
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to GBP 500 million.
Coût total (montant approximatif)
Approximately GBP 2 billion.
Aspects environnementaux
The planned upgrading works within the DBFO contract fall within Annex I of the Directive 85/337/EEC on environmental assessment as amended by 97/11/EC and 2003/35/EC.
Passation des marchés
Procurement of the DBFO operator will be conducted in accordance with Public Works Contracts Regulations 1991 which implement the Public Works Contracts Directive 93/37/EC . Procurement will be undertaken using the restricted procedure after open tender. The contract will be awarded using the negotiated procedure as prescribed in the regulations.
Statut
Signé - 20/05/2009
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).