Search En menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20030255
Release date: 11 August 2003

Promoter – Financial Intermediary

Planta de Regasificación de Sagunto, SA.

Location

Description

The project consists of the design, construction, commissioning and operation of a LNG (Liquefied Natural Gas) import terminal in the extension of the Mediterranean industrial port of Sagunto some 18 km north of Valencia.

Objectives

The project will contribute to meeting gas demand growth and diversifying gas imports to the Iberian Peninsula. The LNG terminal will receive LNG shipments and deliver natural gas to the regional/national gas transmission grids.

Comments

LNG (Liquefied Natural Gas).

Sector(s)

Proposed EIB finance (Approximate amount)

Up to 75% of project cost.

Total cost (Approximate amount)

EUR 350-400 million.

Environmental aspects

The project is classified under Annex I of the Environmental Impact Assessment (EIA) Directive (85/337/EEC as amended by 97/11/EC), and also under the Seveso II directive (EC 96/082) on the prevention of major accidents for projects involving dangerous substances. The promoter has carried out a fully-fledged EIA including public consultation, and obtained the formal approval from the Ministry of Environment in November 2002 (“Declaración de Impacto Ambiental”).

Procurement

In accordance with Directive 93/38/EC, the promoter has advertised for the main turnkey project's construction contract in the EC Official Journal.

Status

Signed - 14/07/2004

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Spain Energy