Date de publication: 11 août 2003
Promoteur – Intermédiaire Financier
Planta de Regasificación de Sagunto, SA.Lieu
Description
The project consists of the design, construction, commissioning and operation of a LNG (Liquefied Natural Gas) import terminal in the extension of the Mediterranean industrial port of Sagunto some 18 km north of Valencia.
Objectifs
The project will contribute to meeting gas demand growth and diversifying gas imports to the Iberian Peninsula. The LNG terminal will receive LNG shipments and deliver natural gas to the regional/national gas transmission grids.
Commentaires
LNG (Liquefied Natural Gas).
Secteur(s)
Montant BEI envisagé (montant approximatif)
Up to 75% of project cost.
Coût total (montant approximatif)
EUR 350-400 million.
Aspects environnementaux
The project is classified under Annex I of the Environmental Impact Assessment (EIA) Directive (85/337/EEC as amended by 97/11/EC), and also under the Seveso II directive (EC 96/082) on the prevention of major accidents for projects involving dangerous substances. The promoter has carried out a fully-fledged EIA including public consultation, and obtained the formal approval from the Ministry of Environment in November 2002 (“Declaración de Impacto Ambiental”).
Passation des marchés
In accordance with Directive 93/38/EC, the promoter has advertised for the main turnkey project's construction contract in the EC Official Journal.
Statut
Signé - 14/07/2004
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).