    Project name
    Promoter - financial intermediary
    GAZA CENTRAL DESALINATION PLANT - GCDP
    PALESTINIAN NATIONAL AUTHORITY
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 395 million
    EUR 582 million
    Location
    Sector(s)
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The operation is a fully grant funded project concerning the construction of a sea water reverse osmosis desalination plant with annual capacity of 55MCM in Gaza. It also includes the related renewable energy component, as well as a five-year subsidy of operating costs and technical assistance for project management and works supervision.

    The project, responding to pressing humanitarian needs, is addressing the scarcity and safety of drinking water in Gaza, which affects 2 million people. It will help regenerate the coastal aquifer, improve living conditions, boost the economy by adding construction jobs and also provide water for industry.

    Environmental aspects
    Procurement

    A full Environmental and Social Impact Assessment (ESIA) and a Resettlement Action Plan (RAP) for the desalination plant have been prepared. The RAP has already been implemented. A separate ESIA for the construction of a photovoltaic power plant to supply energy to the desalination plant is under way.

    Contracts relating to the desalination plant and power generation facility will be procured in compliance with the EIB Guide to Procurement.

    Comments

    The Gaza Central Desalination Plant and Associated Works Programme, developed by the Palestinian Water Authority, comprises two main components: 1. A desalination plant equipped with an independent power generation facility, to be implemented under EIB's supervision. 2. An associated works component that will add a south-north carrier system, which runs 160 kilometers, to be implemented under the World Bank's supervision.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - GAZA CENTRAL DESALINATION PLANT - GCDP
    Publication Date
    21 Dec 2019
    Document language
    Main Topic
    Lending
    Document Number
    123245946
    Document Focus
    Environmental Information
    Project Number
    20180171
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications