Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 153,343,400
    Countries
    Sector(s)
    Finland : € 153,343,400
    Transport : € 153,343,400
    Signature date(s)
    27/10/2005 : € 153,343,400
    Link to source

    Summary sheet

    Release date
    28 April 2005
    Status
    Reference
    Signed | 27/10/2005
    20040217
    Project name
    Promoter - financial intermediary
    E18 Muurla-Lohja PPP Project (TEN)
    Finnish Road Administration (Finnra)
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    Up to EUR 200 million. To be reviewed once the preferred bidder has been appointed. The Bank’s loan would not exceed the usual limits in relation to project cost for this type of project.
    The capital cost is currently estimated to be approximately EUR 360 million, but will be finalized once the preferred bidder has been appointed.
    Location
    Sector(s)
    Description
    Objectives

    The construction and operation of a 50 km section of the E18 motorway between Muurla and Lohja, including seven tunnels, eight interchanges and forty-nine bridge sites.

    The new motorway section will complete the missing link between Turku and Helsinki, thus improving the transport efficiency, safety conditions, and environment protection and savings in travel time for local, as well as for international transit traffic, along the E18.

    Environmental aspects
    Procurement

    The project falls within the scope of Annex 1 of the EC Directive 97/11, requiring a full EIA with public consultation, which has already been undertaken.

    The project will be procured as a Public Private Partnership to design, build, finance and maintain the infrastructure. The payment mechanism will be based on availability and performance payments to the concession company during a 25-year concession. The procurement procedure applied by Finnra is based on Finnish national laws (1505/1992 and 380/1998), which are in accordance with EU Directives. The project was advertised in the Public Procurement Gazette on 11 March 2004, issue 11.2004, and in the Official Journal of the EU, issue S47/2004.

    Comments

    Road Transports.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications