    Reference: 20130324
    Release date: 2 October 2013

    Promoter – Financial Intermediary

    AB FORTUM VAERME HOLDING SAMAEGT MED STOCKHOLMS STAD

    Location

    Description

    Construction of a new biofuel-fired CHP plant in Stockholm.

    Objectives

    The project comprises the design, construction, operation and maintenance of a new biomass combined heat and power (CHP) plant including the necessary upgrading of harbour infrastructure. It will be located in the city of Stockholm and delivering heat to the existing district heating system in Stockholm and electricity to the public grid. The power plant allows for the use of a full range of solid biomass but production is expected to be based on mainly wood chips. The new CHP plant will have a production capacity of 280 MWth heat and 130 MWe electricity.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 260 million

    Total cost (Approximate amount)

    EUR 543 million

    Environmental aspects

    The power plant and its biomass reception and processing infrastructures will be erected inside an existing industrial facility. By virtue of its technical characteristics, the project falls under Annex II of the Directive 2011/92/EU. Here, the Competent Authority requested an EIA for the power plant. Based upon the outcomes of the EIA, the project’s environmental consent was granted in November 2007.

    Procurement

    The promoter falls under the Utilities Directive 2004/17/EC and is obliged to apply public procurement procedures. Compliance with the Utilities Directive has been stated by the promoter and will be verified during appraisal.

    Status

    Signed - 17/06/2014

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).