Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20090296
Release date: 4 November 2009

Promoter – Financial Intermediary

Federal Republic of Germany

Location

Description

The project concerns the widening of a 41 km section of the A8 motorway, part of the TEN-T network, between Ulm and Augsburg, from a 2x2 to 2x3 lane standard.

Objectives

Upgrading of motorway (from four to six lanes) in order to reduce frequent congestion and a high accident frequency rate.

Sector(s)

Proposed EIB finance (Approximate amount)

Up to EUR 250 million

Total cost (Approximate amount)

Currently estimated up to EUR 500 million

Environmental aspects

The project falls under Annex I of the EIA Directive 85/337/EEC, as amended by Directives 97/11/EC and 2003/35/EC and hence an EIA is mandatory. The findings and recommendations of the EIA will be reviewed during the appraisal.

Procurement

The tender was published in the EUOJ on January 29th, 2009 (2009/S 19-026801). The concession will include design, construction, financing, maintenance and operation.

Status

Signed - 31/05/2011

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Germany Transport