Search En menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20060516
Release date: 19 March 2007

Promoter – Financial Intermediary

ÖBB-Infrastruktur Bau AG

Location

Description

The project relates to the construction of two additional tracks on the Priority TEN mainline railway between Vienna and St. Pölten (Westbahn). The total length of this four-track railway line section is 44km, including the 13km Wienerwaldtunnel and additional 6 shorter tunnels.

Objectives

The project will add capacity, operational flexibility and thus reliability, allow faster train operation and improve comfort.

Comments

Priority TENs, sustainable transport

Sector(s)

Proposed EIB finance (Approximate amount)

About EUR 400 million.

Total cost (Approximate amount)

About EUR 1.45 billion.

Environmental aspects

The project would fall under Annex I of EU Directive 97/11/CE. Compliance with the respective requirements will be verified during appraisal.

Procurement

Compliance with the national and EU procurement legislation will be verified during appraisal.

Status

Signed - 6/09/2007

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Austria Transport