Summary sheet

Release date
4 April 2023
Status
Reference
Approved | 15/06/2023
20190393
Project name
Promoter - financial intermediary
LUGOJ-DEVA MOTORWAY II (SPL 2015-0712)
COMPANIA NATIONALA DE ADMINISTRARE A INFRASTRUCTURII RUTIERE - SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 113 million
EUR 411 million
Location
Sector(s)
Description
Objectives

The loan will finance the construction of A1 motorway section between Dumbrava and Deva. In particular, the construction concerns two non-continuous sections of a 2x2-lane motorway with a double carriageway along a new alignment, for a total length of approximately 59 km.

The project is addressing the development of the Rhine-Danube Trans-European Transport Network core network corridor (TEN-T CNC), by investing in the underdeveloped TEN-T road network in a Cohesion region of Romania. The aim is to improve connectivity, accessibility and traffic safety, both along the new alignment and existing national roads. The new transport link will serve local, regional, and international traffic demand and reduce congestion in the settlements along the corridor, notably by diverting most of the heavy vehicles from the national road to the new motorway. By reducing travel times, accident levels and inhabitants' exposure to air and noise pollutants, the new motorway section will considerably improve residents' life quality.

Additionality and Impact

The Project is located on the Core TEN-T Network in a Cohesion region of Romania. The Project addresses the market/network failures related to accessibility along the Core TEN-T Network, in particular the Rhine-Danube TEN-T CNC.

The Project will improve connectivity and accessibility as well as the traffic safety, offering a modern connection for the transit traffic along the main road corridor from Constanta through Bucharest towards the Hungarian border. The Project will serve local, regional and international traffic demand. The project has benefited from JASPERS and PASU Technical Assistance to the Managing Authority to prepare the EU funds application and phasing proposal as well as during the project implementation. The EIB loan will finance the State contribution to the project, therefore, Romania will benefit from the advantageous financial conditions offered by EIB, including long tenors (up to 25 years) and attractive interest rates. Such conditions will allow Romania for a considerable financial flexibility in the implementation of its transport infrastructural investments.




 

Environmental aspects
Procurement

The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, requiring a full environmental impact assessment (EIA) procedure. EIA studies have been completed and the competent authorities have issued environmental decisions and the development permits. The EU and Romania national legal procedures have been properly followed in the project preparation and implementation.

The promoter is a public contracting authority subject to the relevant EU directives. All contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU), as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Milestone
Approved
15 June 2023
Related projects
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - LUGOJ-DEVA MOTORWAY II (SPL 2015-0712) - Raport la Studiul de Evaluare a Impactului Asupra Mediului - Lugoj-Deva
Publication Date
11 Apr 2023
Document language
Main Topic
Lending
Document Number
165544880
Document Focus
Environmental Information
Project Number
20190393
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - LUGOJ-DEVA MOTORWAY II (SPL 2015-0712) - Raport Privind Asupra Mediului
Publication Date
12 Apr 2023
Document language
Main Topic
Lending
Document Number
165534804
Document Focus
Environmental Information
Project Number
20190393
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - LUGOJ-DEVA MOTORWAY II (SPL 2015-0712) - Studiul de Evaluare Adecvata - Lugoj-Deva
Publication Date
12 Apr 2023
Document language
Main Topic
Lending
Document Number
165548065
Document Focus
Environmental Information
Project Number
20190393
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - LUGOJ-DEVA MOTORWAY II (SPL 2015-0712)
Publication Date
17 Jun 2023
Document language
Main Topic
Lending
Document Number
159272654
Document Focus
Environmental Information
Project Number
20190393
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Completion Sheet (ESCS) - LUGOJ-DEVA MOTORWAY II (SPL 2015-0712)
Publication Date
30 Nov 2024
Document language
Main Topic
Lending
Document Number
227121033
Document Focus
Environmental Information
Project Number
20190393
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications