12 September 2017
Status
Reference
Approved | 27/10/2017
20170313
Project name
Promoter - financial intermediary
RAILWAY LINE POLJCANE-SLOVENSKA BISTRICA UPGRADE
REPUBLIC OF SLOVENIA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 18 million
EUR 58 million
Location
Sector(s)
Description
Objectives

The Slovenian Celje-Pragersko railway line is located on the Baltic-Adriatic and Mediterranean Core Network Corridors. The line currently represents a bottleneck in passenger and freight transport due to insufficient load capacity and limited interoperability. The project concerns construction works in the Poljcane station, the Poljcane–Slovenska Bistrica section and the Slovenska Bistrica station. The works cover reconstruction of substructure and superstructure, construction of platforms, grade-separated crossings, underpasses, as well as adjustments of energy, signalling-safety and telecommunication devices.

The project will upgrade the Poljcane-Slovenska Bistrica double-track section with the main objective of increasing the load capacity and improving the interoperability of the railway line.

Environmental aspects
Procurement

The pertinence to Annexes I and II of the Environmental Impact Assessment (EIA) Directive, the screening decisions, the EIA and the development consents will be reviewed during appraisal. The project's potential impact on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC) will also be appraised. A modal shift thanks to increased rail-based mobility can be expected (due to increased speed and capacity), thus also decreasing traffic-related greenhouse gas emissions, although to a limited extent. Details will be checked during appraisal.

The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/17/EC, or 2014/25/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC), as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Related projects

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.