Signature(s)

Amount
€ 70,968,052.35
Countries
Sector(s)
Poland : € 70,968,052.35
Energy : € 70,968,052.35
Signature date(s)
18/07/2014 : € 70,968,052.35
Link to source

Summary sheet

Release date
26 June 2013
Status
Reference
Signed | 18/07/2014
20120511
Project name
Promoter - financial intermediary
ENERGY INFRASTRUCTURE PROJECT
One of the largest power industry companies in Poland.
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
PLN 600 million (EUR 146 million)
PLN 1250 million (EUR 304 million)
Location
Sector(s)
Description
Objectives

The project concerns an investment programme comprising the following components: 1) Electricity distribution, consisting of multiple schemes involving around 11 000 new connections, construction of new and upgrading of existing 110/20kV substations, associated equipment and associated overhead lines, and roll out of smart metering 2) the modernisation and refurbishment of around seven existing small hydro power stations ranging in size and age from 0.3 to 13MW and 50 to 100 years respectively; 3) the construction of a new gas fired CCGT cogeneration plant of 135MW electrical capacity and 90MW thermal capacity to feed the local district heating system. The project will be dispersed throughout southern Poland.

Regarding the individual project components - 1) Electricity distribution - the project will enable the promoter to cater for implementing new connections, improve safety, improve the reliability of electricity supply, and support the development of smart grids through the smart metering pilot roll out; 2) Hydro - the project will ensure the continued operation and extension of life of existing hydro power plants and the production of renewable electricity at a competitive cost; 3) CCGT cogeneration - the project will contribute to meeting heat and electricity demand and support security of supply by using natural gas as a fuel source. All components of the project are located in a convergence region. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions. The financing of this project will contribute to the Bank’s lending priority policy towards convergence, security and diversification of energy supply and renewable energy.

Environmental aspects
Procurement

Considering the technical characteristics of the electrical distribution and hydro components, the schemes fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), and consequently it is the responsibility of the competent authority to determine the need for an EIA. For the Electrical distribution component, due to the nature of the schemes it is not envisaged that EIAs will be required. For the hydro component the promoter has confirmed that two schemes require EIAs, which have been completed. Regarding the CCGT CHP plant, this falls under Annex I of the EIA Directive. An EIA has been prepared and the environmental authorisation issued. The plant will be located on a brown field site within the boundaries of an existing facility. The environmental aspects of the project will be further assessed during appraisal. The Bank has had three previous operations with this promoter and its environmental capacity is deemed to be good.

The promoter is a public undertaking in the sense of Art. 2.1(b) of the Procurement Directive - 2004/17/EC. The procurement of works, goods and services is undertaken, by the Promoter, in accordance with the Polish Public Procurement Act 2010, and successive amendments, which transpose the requirements of the EU procurement legislation – Dir. 2004/17/EC, Dir. 2007/66/EC amending Directives 1989/665/EEC and 1992/12/EEC. Tender notices, as and where appropriate, are published in the EU Official Journal as well as in the Polish press. The procurement procedures will be further assessed during appraisal.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - TAURON ENERGY INFRASTRUCTURE
Publication Date
17 Jan 2014
Document language
Main Topic
Lending
Document Number
48499288
Document Focus
Environmental Information
Project Number
20120511
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Completion Sheet (ESCS) - TAURON ENERGY INFRASTRUCTURE
Publication Date
24 Jan 2020
Document language
Main Topic
Lending
Document Number
124633803
Document Focus
Environmental Information
Project Number
20120511
Sector(s)
Regions
Countries
Publicly available
Download now

News & Stories

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications