    Signature(s)

    Amount
    € 150,000,000
    Countries
    Sector(s)
    Hungary : € 150,000,000
    Telecom : € 150,000,000
    Signature date(s)
    26/11/2010 : € 150,000,000
    Link to source

    Summary sheet

    Release date
    14 June 2010
    Status
    Reference
    Signed | 26/11/2010
    20100131
    Project name
    Promoter - financial intermediary
    Magyar Telekom LTE & NGN

    The promoter, Magyar Telekom Nyrt. (MT), is Hungary's principal provider of telecom services. It provides a full range of telecommunications and infocommunications (ICT) services including fixed line and mobile telephony, data transmission and non-voice as well as IT and systems integration services.

    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 150 million.
    Project cost level complies with EIB rule of financing up to 50% of the project cost.
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the development of the promoter’s mobile (3G and LTE) and fixed line (copper, cable, Next Generation Access) telecom infrastructure in Hungary. The project will support the roll-out of the LTE network in Hungary, and fixed broadband will enable very high speed (up to 100 Mbit/s) services for over 1 million Hungarian households.

    This project will assist in providing Hungary with wider availability of competitive mobile and fixed broadband access networks. The project results in the first deployment of LTE and expansion of 3G mobile networks increasing the geographical coverage of mobile broadband in Hungary, therefore having an effect of bridging the current digital divide in the country.

    The project supports the Digital Agenda for Europe flagship initiative of the EU2020 Strategy through further development of modern mobile and fixed line infrastructures, the key platforms for the provision of advanced broadband services.

    Environmental aspects
    Procurement

    The project does not fall under Annex I or II of EIA directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC. Generally mobile networks based on GSM/UMTS technology have limited environmental effects. The visual impact of base station towers or other impacts can be mitigated by appropriate construction and operation measures. Potential health risks from electromagnetic radiation are still under study at an international level, and the ICNIRP thresholds have been considered appropriate in the EU legislation. The promoter’s approach to visual and health impacts and its legal compliance will be assessed during appraisal, including the possible impacts on protected flora and fauna (Habitats 92/43/EC and Birds 79/409/EC).

    According to utility directive 2004/17/EC the telecommunications sector is exempt from public procurement procedures due to its competitive nature. The procurement processes of the promoter are regulated in details also at levels of Policies and Procedures. The effectiveness of the procedures applied will be assessed during appraisal.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    News & Stories

    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications