Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
  • Date: 06/01/2025
  • Reference:

The Jamjee Solar PV Project is located about 25 km from the capital city, under Mewang Gewog, Thimphu. The project site at Jamjee is divided into three sites totalling to about 423 acres of land. One of the three sites is connected by a bitumen-paved road from the Thimphu-Phuentsholing National Highway. The sites have a 220/66/33 kV GIS substation of Bhutan Power Corporation Limited (BPC) in their vicinity with the capacity of 3 x 80 MVA at 220/33 kV level and another 2 x 30 MVA at 220/66 kV level. About 40 % of the total land area has slopes higher than 20 degrees, 20% in between 16 to 20 degrees and 40% below 16 degrees.

Corrigendum

Contract notice

  • Download the notice of 06/01/2025
  • Deadline for receipt of tenders or requests to participate: 19/02/2025

Disclaimer

This procurement is conducted by the EIB Borrowers/Promoters in accordance with the Guide to Procurement for the contract under the EIB-financed project. The EIB is not a party to the contract and its role is limited to those defined in the Guide to Procurement.