    Signature(s)

    Amount
    € 450,000,000
    Countries
    Sector(s)
    Spain : € 450,000,000
    Energy : € 450,000,000
    Signature date(s)
    11/06/2010 : € 150,000,000
    11/06/2010 : € 300,000,000
    Other links

    Summary sheet

    Release date
    1 April 2009
    Status
    Reference
    Signed | 11/06/2010
    20080637
    Project name
    Promoter - financial intermediary
    Electrica Fenosa IX
    Unión Fenosa SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    Up to 50% of project cost.
    Approximately EUR 1 170 million.
    Location
    Sector(s)
    Description
    Objectives

    The project comprises a large number of independent and geographically dispersed schemes for extending and modernising the promoter’s sub-transmission and distribution electricity networks. The project includes the implementation of 800 km of HV lines, 2700 km of MV lines, 3900 km of LV lines and 1800 MVA of MV/LV transformation capacity. The project capacity will be investigated in detail during appraisal. For the distribution network this will include the analysis of the overall capacities (km and MVA) of the different categories of network equipment (MV lines, LV lines and transformer stations). Description and capacity of the main sub-transmission project schemes (HV voltage lines and substations) will be analysed individually.

    The project will enable the promoter to cater for demand growth, to enable connection of new system users, and to improve the quality and the reliability of supply in a convergence area.

    Environmental aspects
    Procurement

    Some schemes of the project involving long 220 kV overhead lines will fall under Annex I of the EIA Directive while the remainder will fall under Annex II, leaving it to the national competent authority to decide whether an EIA would be required in line with the screening criteria specified in the directive. Many project schemes are expected to be distribution reinforcements that will not require EIAs and will have minimal or no environmental impact.

    The impacts that can be typically expected for the project schemes relate to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbance during construction. The EIA screening criteria applied by the national competent authority in Spain and the provisions for biodiversity assessment of projects will be investigated during appraisal.

    The promoter is subject to the Public Procurement Act of Spain (Ley 31/2007) that came into force in October 2007 transposing the EU Directives on public procurement. The promoter’s approach for procurement of goods and services in the distribution sectors will be evaluated during appraisal.

    Other links

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications