Veröffentlichungsdatum: 13 März 2002
Projektträger – zwischengeschaltetes Finanzinstitut
Samsun Water and Sewerage Administration - SASKIOrt
Beschreibung
The project encompasses the (i) rehabilitation of existing wastewater facilities, (ii) improvement of stormwater collection, (iii) rehabilitation and construction of lift and pumping stations, (iv) construction of new wastewater collection lines, (v) a treatment plant and (vi) a long sea outfall.
Ziele
The project will mitigate problems with the current wastewater system which include pollution of the coastal area, mainly from households, infiltration of groundwater into sewer lines and sedimentation in sewer inceptors, causing unpleasant odours.
Kommentar(e)
Wastewater treatment
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Approximately EUR 35 million
Gesamtkosten (voraussichtlicher Betrag)
Approximately EUR 70 million, to be appraised
Umweltaspekte
The project, based on a Feasibility Study under METAP, will have a positive impact on the environment in terms of reduced pollution of coastal areas, reduced health risks through bacteriological contamination, reduction of odours mainly at lift stations and improvement of flood and soil erosion control.
Auftragsvergabe
EIB's usual procurement procedures of open international competitive bidding with tender publication in the Official Journal of the European Communities.
Projektstatus
Unterzeichnet - 21/03/2005
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).