Date de publication: 13 mars 2002
Promoteur – Intermédiaire Financier
Samsun Water and Sewerage Administration - SASKILieu
Description
The project encompasses the (i) rehabilitation of existing wastewater facilities, (ii) improvement of stormwater collection, (iii) rehabilitation and construction of lift and pumping stations, (iv) construction of new wastewater collection lines, (v) a treatment plant and (vi) a long sea outfall.
Objectifs
The project will mitigate problems with the current wastewater system which include pollution of the coastal area, mainly from households, infiltration of groundwater into sewer lines and sedimentation in sewer inceptors, causing unpleasant odours.
Commentaires
Wastewater treatment
Secteur(s)
Montant BEI envisagé (montant approximatif)
Approximately EUR 35 million
Coût total (montant approximatif)
Approximately EUR 70 million, to be appraised
Aspects environnementaux
The project, based on a Feasibility Study under METAP, will have a positive impact on the environment in terms of reduced pollution of coastal areas, reduced health risks through bacteriological contamination, reduction of odours mainly at lift stations and improvement of flood and soil erosion control.
Passation des marchés
EIB's usual procurement procedures of open international competitive bidding with tender publication in the Official Journal of the European Communities.
Statut
Signé - 21/03/2005
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).