Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20220181
    Veröffentlichungsdatum: 1 September 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    PUBLIC ENTITY(IES)

    Ort

    Beschreibung

    Programme loan financing multiple energy efficiency investments in the municipal sector in Romania, targeting residential buildings and other public owned assets (e.g. public buildings and street lighting).

    Ziele

    The proposed programme loan will finance energy efficiency investments undertaken by various Sub-Sovereign Public Authorities (SSPAs). At this stage, the proposed programme loan targets around 6-8 SSPAs.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 300 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 400 million

    Umweltaspekte

    This programme loan will include projects related to the energy efficiency investments in existing multi-apartment and public buildings and other public owned assets (e.g. street lighting) and will generate environmental benefits by reducing energy consumption, promoting building integrated renewable energy sources, reducing greenhouse gas (GHG) emissions and help to mitigate climate change. The sub-projects to be financed under the different allocations (renovation of multi-apartment buildings) are expected to have very limited negative environmental impacts exclusively during renovation (noise pollution). Given the scale, location and nature of the sub-projects an environmental impact assessment (EIA), as defined under the EIA Directive 2011/92/EU, is normally not required. The subprojects included under this programme loan, consisting of energy efficient investments and building integrated renewables, will comply with the requirements of the relevant EU Directives (Energy Performance of Buildings Directive - EPBD), with the EIB Energy Lending Policy and the EU Taxonomy.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation (Directive 2014/24/EU as well as Directive 92/13/EEC or Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Projektstatus

    Genehmigt - 26/10/2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Rumänien Stadtentwicklung