Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20030486
    Veröffentlichungsdatum: 19 Dezember 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    Dwr Cymru Cyfyngedig (Welsh Water)
    Pentwyn Road
    Nelson, Treharris
    Mid Glamorgan CF46 6LY
    UK

    Contact Point: Neil Webb

    Ort

    Beschreibung

    The project comprises numerous wastewater treatment schemes located throughout the Promoter’s operating area. Welsh Water’s capital programme has been approved and its implementation is closely monitored by the public sector water regulator, OFWAT, the Environmental Agency and the Drinking Water Inspectorate. A large part of the schemes is located in Regional Development Areas.

    Ziele

    The project aims at ensuring Welsh Water’s compliance with the revised EU Urban Waste Water Treatment Directive. All of the schemes included within the project focus on quality improvements and attainment of increasingly stringent environmental standards required by EU and national legislation.

    Kommentar(e)

    Environment and Regional Development.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to GBP 35m.

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated to be about GBP 95m for the period 2003-05.

    Umweltaspekte

    The investments included within the project will serve to improve compliance with the EU Drinking Water Directive (98/83/EC), and to meet the 2005 deadlines of the Urban Waste Water Treatment Directive (91/271/EEC). The project will also help to meet national river quality objective (RQO) improvement targets set by the UK Environmental Agency, which are in line with the objectives of the EU Water Framework Directive.

    Auftragsvergabe

    The programme falls under the Procurement Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed to fully comply with its requirements.

    Projektstatus

    Unterzeichnet - 12/08/2004

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Wasser, Abwasser