Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20030486
    Date de publication: 19 décembre 2003

    Promoteur – Intermédiaire Financier

    Dwr Cymru Cyfyngedig (Welsh Water)
    Pentwyn Road
    Nelson, Treharris
    Mid Glamorgan CF46 6LY
    UK

    Contact Point: Neil Webb

    Lieu

    Description

    The project comprises numerous wastewater treatment schemes located throughout the Promoter’s operating area. Welsh Water’s capital programme has been approved and its implementation is closely monitored by the public sector water regulator, OFWAT, the Environmental Agency and the Drinking Water Inspectorate. A large part of the schemes is located in Regional Development Areas.

    Objectifs

    The project aims at ensuring Welsh Water’s compliance with the revised EU Urban Waste Water Treatment Directive. All of the schemes included within the project focus on quality improvements and attainment of increasingly stringent environmental standards required by EU and national legislation.

    Commentaires

    Environment and Regional Development.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    Up to GBP 35m.

    Coût total (montant approximatif)

    Estimated to be about GBP 95m for the period 2003-05.

    Aspects environnementaux

    The investments included within the project will serve to improve compliance with the EU Drinking Water Directive (98/83/EC), and to meet the 2005 deadlines of the Urban Waste Water Treatment Directive (91/271/EEC). The project will also help to meet national river quality objective (RQO) improvement targets set by the UK Environmental Agency, which are in line with the objectives of the EU Water Framework Directive.

    Passation des marchés

    The programme falls under the Procurement Directive 93/38/EC and its amendment 98/4/EC. The promoter has confirmed to fully comply with its requirements.

    Statut

    Signé - 12/08/2004

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Royaume-Uni Eau, assainissement