Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090322
    Veröffentlichungsdatum: 13 Oktober 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    Ofgem - Office of the Gas and Electricity Markets (GB regulatory authority)

    Ort

    Beschreibung

    The operation would concern several, separated transmission connection projects for offshore wind farms located in UK waters. Ofgem has developed a new regulatory regime for offshore transmission systems, whereby the authority will licence new Offshore Transmission Owners (OFTOs) - to own and maintain these assets over a 20 year period.

    Ziele

    The regulatory entities will operate and maintain offshore transmission assets essential to the export of electricity from offshore windfarms, the development of which supports EU and national targets for renewable energy.

    Kommentar(e)

    In line with the Bank’s eligibility guidelines, only those networks not yet constructed will be considered for EIB funding. On this basis, these are expected to be Sheringham Shoal, Ormonde, Greater Gabbard, Thanet, Walney 1 and Walney 2

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to 50% of total eligible project cost associated with each individual OFTO.

    Gesamtkosten (voraussichtlicher Betrag)

    To be determined during appraisal

    Umweltaspekte

    An offshore wind farm including its associated equipment such as the transmission system falls by virtue of its technical characteristics under Annex II of EIA-Directive 85/337/EEC (as amended). According to national regulations an offshore wind farm is subject to a full mandatory EIA including public consultation. Further details of the environmental due diligence procedures applied for each of the transmission assets considered eligible for being financed by the Bank, will be assessed by the Bank during appraisal to verify compliance with the Bank’s environmental policy.

    Auftragsvergabe

    The regulatory authority Ofgem runs a competitive tender process following publication of a contract notice in EUOJ to identify preferred bidders for future OFTOs. A long list of pre-qualified bidders was announced. The tender process allows for interested parties to bid for multiple projects, and tenders will be conducted separately for each qualifying windfarm development.

    Projektstatus

    Unterzeichnet - 21/10/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Vereinigtes Königreich Energie