Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20190810
    Release date: 20 October 2022

    Promoter – Financial Intermediary

    MINISTERE DE L'EQUIPEMENT,DE L'AMENAGEMENT DU TERRITOIRE

    Location

    Description

    The project aims at upgrading the RN13 road section between Sfax and Kasserine (180 km) from 2x1 to 2x2 lanes, including median barriers. This road is leading to the Algerian border, about 50 km further east.

    Objectives

    The project is in line with the general policy of the country and has been selected as a national priority of the National Transport Master Plan 2040 and was considered for the Action Plan for the Period 2020 to 2030.

    Comments

    The signature is expected to occur in the first half of 2023.

    Sector(s)

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Proposed EIB finance (Approximate amount)

    EUR 210 million

    Total cost (Approximate amount)

    EUR 424 million

    Environmental aspects

    The Bank shall investigate environmental and social aspects during appraisal and verify that the promoter has followed the relevant EU environmental and social principles, standards and practices. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures. Public consultation at feasibility studies and preliminary design stages were carried out for most of the project scope. They are being updated for the final technical description and will be reviewed. Stakeholder engagement arrangements and particularly grievance mechanism for project implementation will also be assessed.  The preliminary Climate Risk Assessment shows risks of flooding in various project sections, notably in the vicinity of main cities and rivers. The preliminary design considers 50 to 100-year return periods for drainage systems depending on risk and size. Detailed design will assess if more climate adaptation measures are required.

    Procurement

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Status

    Approved - 8/12/2022

    Milestone
    Under appraisal
    Approved
    8 December 2022

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Tunisia Transport