Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20170985
    Release date: 24 May 2018

    Promoter – Financial Intermediary

    DRUZBA ZA AVTOCESTE V REPUBLIKI SLOVENIJI DD

    Location

    Description

    The project consists of the construction of a second tunnel tube, located on the comprehensive Trans-European Transport Network (TEN-T), connecting the A2 motorway in Slovenia with the A11 motorway in Austria. The current single-tube tunnel with two-way traffic does not meet the minimum safety requirements for tunnels in the TEN-T. The construction of a second tunnel tube, combined with the comprehensive renovation of the existing tunnel tube, will ensure that the mandatory safety requirements under Directive 2004/54/EC are met. The project is also expected to improve traffic flow on the network connecting Central Europe with the Balkans.

    Objectives

    The project will lead to increased safety standards, in line with EU requirements, and in turn to a reduced likelihood of traffic accidents as well as to reduced waiting times for domestic and cross-country traffic, often significant due to frequent queues on both sides.

    Sector(s)

    Proposed EIB finance (Approximate amount)

    EUR 90 million

    Total cost (Approximate amount)

    EUR 202 million

    Environmental aspects

    The project is expected to have a positive impact by reducing carbon dioxide (CO2) and pollutants (Nitrogen Oxide - NOx, hydrocarbons and dusts) emitted in the air by queuing vehicles. With regards to the excavation material, landfills have been identified and relevant approvals have been obtained or approval is in progress. The impact is otherwise deemed as minor or moderate (as to e.g. underground water or dust in the air during the construction period) and relevant mitigation measures are foreseen.

    Procurement

    The public procurement tender for the project was published in the Official Journal of the European Union on 14.12.2017 under the number: 2017 / S 240-497526. The Bank will confirm during the appraisal that the project has been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2004/18/EC, where applicable, as well as Directives 89/665/EEC, Directive 2014/24, and Directive 89/665/EEC) as interpreted by the Court of Justice of the EU.

    Status

    Signed - 13/02/2020

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Slovenia Transport