Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20170923
    Release date: 2 February 2018

    Promoter – Financial Intermediary

    REPUBLIC OF CROATIA

    Location

    Description

    The project aims at reaching compliance with Urban Wastewater Directive for 6 agglomerations on the Island of Krk. The project is co-financed by ESIF (European Structural and Investment Funds) under the Operational Programme Competitiveness and Cohesion and has been reviewed by JASPERS Independent Quality Review (IQR).

    Objectives

    The project will contribute to Environmental Protection and Natural Resource Efficiency.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities

    Proposed EIB finance (Approximate amount)

    EUR 6 million

    Total cost (Approximate amount)

    EUR 69 million

    Environmental aspects

    The project's components will contribute to ensure compliance with key EU directives in the water sector notably the Urban Waste Water Treatment Directive (91/271/EC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the EIA Directive 2011/92/EU as amended by 2014/52/EU and SEA Directive 2001/42/EC will be respected. The promoter will in such case, prior to utilizing any EIB funds, be responsible for transmitting to the Bank the non-technical summary of the Environmental Impact Assessment (EIA). For any part of the project that may impact on a nature conservation site, the promoter will be required to provide to the Bank an approval of the competent authority and information on the mitigating measures required to comply with the Habitats Directive 92/43/EEC.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC) as interpreted by the Court of Justice of the European Union, with publication of tender notices in the Official Journal of the European Union (OJEU), as and where required.

    Status

    Approved - 9/04/2018

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Croatia Water, sewerage