Release date: 18 June 2014
Promoter – Financial Intermediary
GLAS CYMRU CYFYNGEDIGLocation
Description
Welsh Water provides 3.2 million people in Wales and adjoining areas of England with drinking water and sanitation. The Programme comprises Improvements to water supply and wastewater collection and treatment as part of the second half of Welsh Water's regulatory investment programme AMP5 (Asset Management Plan 5). The Programme was approved by the economic regulator OFWAT in 2009. The Programme includes a signficant programme of measures to increase the resilience and performance of drinking water treatment and water supply assets in general as well as a programme of wastewater treatment improvements in order to achieve compliance with the EU Wastewater Treatment Directve and stricter EU standards for bathing water.
Objectives
Environmental Protection
EIB Cohesion Priority Regions / Economic and Social Cohesion (transversal)
Sector(s)
Proposed EIB finance (Approximate amount)
EUR 276 million (GBP 230 million)
Total cost (Approximate amount)
EUR 606 million (GBP 505 million)
Environmental aspects
The Promoter complies with the requirements of EU EIA Directive 2011/92/EU, as well as Article 6 of the Habitats Directive 92/43/EEC. The Promoter carries out Environmental Impact Assessment procedures where required by the competent authorities and mitigating measures are applied as appropriate. The drinking water quality and environmental regulators independently monitor compliance with drinking water quality standards and effluent discharge permits.
Procurement
The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation Dir 2004/18/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.
Status
Signed - 17/11/2014
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).