Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
    Reference: 20120391
    Release date: 26 July 2016

    Promoter – Financial Intermediary

    Bucharest Municipality

    Location

    Description

    Finalisation of Glina wastewater treatment plant, rehabilitation of the main sewer collectors and of Dambovita sewer collector canal (CASETA)

    Objectives

    To have adequate treatment of the entire wastewater flow from the city at levels that comply with EU Directives, to reduce the level of infiltration rate in the sewer network and to have a sustainable solution for processing the entire sewage sludge production.

    Sector(s)

    • Water, sewerage - Water supply; sewerage, waste management and remediation activities

    Proposed EIB finance (Approximate amount)

    EUR 75 million

    Total cost (Approximate amount)

    EUR 353 million

    Environmental aspects

    The project is strongly environmentally driven and therefore has predominantly positive effects on the environment. The assessment pursuant to SEA Directive 2001/42/EC and to respective national GD1076/2004 was carried out for the overall Operational Programme. The project was subject to Environmental Impact Assessment (EIA) screening (screened in), and subsequently to the environmental impact assessment pursuant to Directive 2011/92/EC and respective national GD 445/2009. The Environmental Agreement was issued in 01/2013. Separate assessments were carried out for effects on the sites in NATURA 2000 network (pursuant to Habitats Directive 92/43/EEC and Birds Directive 2009/147/EC). The project is unlikely to have significant negative effects on the protected areas and sites.

    Procurement

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been and shall be tendered in accordance with the relevant applicable EU procurement legislation (i.e. Directive 2014/24/EU as well as Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Status

    Signed - 8/11/2017

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Related tags

    Romania Water, sewerage