Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages
Reference: 20120191
Release date: 12 April 2012

Promoter – Financial Intermediary

PKP POLSKIE LINIE KOLEJOWE SA

Location

Description

The project involves the repair and upgrading of 159.2 km of the E30 and C-E30 train line in Poland between Opole, Wroclaw and Legnica .The project is located on a TEN-T network and is being implemented by PKP Polskie Linie Kolejowe SA . It will enable modernisation including adaptation to standards resulting from international agreements.

Objectives

The loanwill enable modernisation, including adaptation to standards resulting from international agreements.

Comments

Sector(s)

Proposed EIB finance (Approximate amount)

EUR 102 million

Total cost (Approximate amount)

EUR 484 million

Environmental aspects

The project falls under Annex II of the EIA 85/337/EEC as amended.The Competent Authority has screened in some sections and an EIA was done. The Birds Directive (79/409/EEC) and Habitats Directive (92/43/EEC) are applicable. During appraisal the impact of the project on the environment would be determined and the mitigating/compensating measures reviewed.

Procurement

The 20 to 30 sub projects along the sections are being implemented by private contractors. Sub-projects with a value higher than the ceiling for international tenders are being advertised in the OJEU and the local press in keeping with national and EU requirements. The procedures are to be reviewed during appraisal.

Status

Approved - 4/07/2012

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Related tags

Poland Transport