Promoter – Financial Intermediary

The General Directorate of National Roads and Motorways (GDDKiA)

Location

Description

The project concerns the installation of an Electronic Tolling System (ETS) on part of the motorway, expressway and highway network across Poland. The use of the ETS will be compulsory for heavy goods vehicles of more than 3.5 tonnes over the designated network from July 2011. Its use will be voluntary for light vehicles from January 2012. The selected system for the project adopts Dedicated Short Range Communications (DSRC) using microwave tags inside vehicles (so called on board units, OBU) to register vehicle passages under microwave receivers mounted on overhead gantries on each section of tolled road. The project also includes the related customer service, OBU distribution, accounting and enforcement system.

Objectives

The project will be implemented in a Convergence Region. The motorways, expressways and highways to be covered by the project are mostly on the trans-European transport network. The project will facilitate the expansion of distance-based charging for road use in Poland. This will allow a more refined application of “polluter and user pays” principles forming part of the sustainable mobility solutions set down in EU policy. The project is therefore eligible under Article 309 point (a) projects for developing less-developed regions and point (c) common interest. The project is consistent with the EIB’s Revised Lending Policy for Transport (CA Decision 409/07).

Sector(s)

Proposed EIB finance (Approximate amount)

Up to PLN 589 million (EUR 150 million)

Total cost (Approximate amount)

The investment cost is currently estimated at PLN 1 177 million (EUR 300 million).

Environmental aspects

The activities in the scope of the project include: the erection of gantries and associated power supply within the existing right of way; distribution of on-board units to be installed in vehicles; the supply of enforcement vehicles; as well as the creation of a national sales network and the development of a nationwide IT system (both within existing buildings). These activities fall outside the scope of Directive 85/337/EEC as amended and therefore no Environmental Impact Assessment procedure is required.

Procurement

The promoter is a public contracting authority, subject to the relevant Directives. The adopted procedures for all project activities are to be reviewed during appraisal.

Status

Signed - 27/09/2011

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.