Release date: 16 October 2008
Promoter – Financial Intermediary
Ministry of Finance.
Location
Description
This project is a proposed loan allocation under the China Climate Change Framework Loan (CCCFL). The project concerns various technical improvements in the coke plant (composed of 5 coke ovens coupled in two units) of an existing steel plant at Shaogang Songshan plant in Guangdong.
The project is composed of 3 different subprojects, linked with the substitution of the wet quenching process by the CDQ process (Coke Dry Quenching), including: (i) and (ii) CDQ process equipment on a 6 m Coke oven and a 4.3 m Coke oven, and (iii) the construction and the operation of various gas tanks (by-products of the process).
Objectives
The proposed operation would contribute to reducing the coke losses in the process of coke production, improving the coke quality, significantly reducing the environmental impact (atmospheric and liquid emissions, solid residues disposal) of this step of the steel process and improving overall energy efficiency.
Sector(s)
Proposed EIB finance (Approximate amount)
Up to EUR 35 million.
Total cost (Approximate amount)
EUR 63 million.
Environmental aspects
The key objective of this allocation is to contribute to climate change mitigation. The schemes proposed under this project if located in the EU would be categorized as Annex I or II-type projects under the Environmental Impact Assessment (EIA) 97/11 amended 2003/35 Directive, which would require a mandatory environmental impact assessment or a review by the competent authority for the need to carry out an EIA. The investment schemes shall be prepared in line with the relevant national and EU environmental standards, including due consideration for protection of sites of nature conservation, as well as the social safeguards of the Bank. EIAs have already been prepared by specialized consultants. These issues will be addressed during the appraisal of the subprojects.
Procurement
Procurement will be undertaken in accordance with the Bank’s Procurement Guidelines.
Status
Under appraisal - 16/10/2008
Disclaimer
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).