Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Summary sheet

Release date
17 July 2023
Status
Reference
Approved | 12/07/2023
20220711
Project name
Promoter - financial intermediary
ENDESA WIND AND SOLAR SECOND ALLOCATION
ENEL GREEN POWER ESPANA SL
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 292 million
EUR 584 million
Location
Sector(s)
  • Energy - Electricity, gas, steam and air conditioning supply
Description
Objectives

The operation supports solar and wind renewable energy generation projects in Spain. This is the second allocation under the Framework Loan (FL) 2020-0916, approved by the EIB Board of Directors on 22.07.2021 (CA/545/21/451).

The aim is to contribute to achieve the EU-wide target of reaching 32% of energy from renewable sources in gross final energy consumption by 2030, as set out in the Renewable Energy Directive (EU 2018/2001). It also contributes towards the renewable energy targets outlined in the Spain's National Energy and Climate Plan (NECP). The operation is in line with both the EIB's cohesion financing and with the lending priority related to renewable energy and climate action.

Additionality and Impact

This operation concerns the development and operation of a portfolio of onshore wind and solar PV projects that will contribute to the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan (NECP) of Spain and the REPowerEU action plan. The projects are located in two Cohesion Regions.

The financing of this operation contributes to Bank's lending priority objectives on Renewable Energy, Environmental Sustainability, Climate Action, as well as Economic and Social Cohesion.

The underlying projects produce electricity from low carbon sources (solar PV and on-shore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).

The underlying projects will rely on revenues from the wholesale market and unsubsidised commercial power purchase agreements (cPPA), thus the operation improves market efficiency and competition. The operation is expected to yield good quality and results, thanks to avoided GHG emissions and fair employment creation.

The promoter has a recognised in-house design and project management capacity with a significant track-record of international energy projects. The project is supported by adequate governance and capabilities of the promoter. 

The EIB's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. 

Environmental aspects
Procurement

All projects and grid interconnection infrastructure have required an Environmental Impact Assessment (EIA), including public consultation. The competent authorities considered all the comments presented during the EIA, in line with the legal framework. General quality of the Environmental Impact Studies (EIS), in terms of the impact assessment methodology, studies and fieldwork conducted is considered acceptable. The EIS of each plant and ancillary facilities such as the transmission lines included a cumulative impacts assessment taking into account the neighbouring (existing and planned) infrastructures, including the plants within the relevant cluster. The plants and associated infrastructure obtained their environmental permits (Declaracion de Impacto Ambiental - DIA) between 2018-2022. The wind cluster is in the last stage of construction, with projects already energized in December 2022 and PV schemes are currently under construction with the last plants expected to be operational by end of 2023.

The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

Milestone
Approved
12 July 2023
Related projects
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - ENDESA WIND AND SOLAR SECOND ALLOCATION
Publication Date
19 Jul 2023
Document language
Main Topic
Lending
Document Number
169215587
Document Focus
Environmental Information
Project Number
20220711
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications