Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Fiche récapitulative

    Date de publication
    17 juillet 2023
    Statut
    Référence
    Approuvé | 12/07/2023
    20220711
    Nom du projet
    Promoteur – Intermédiaire financier
    ENDESA WIND AND SOLAR SECOND ALLOCATION
    ENEL GREEN POWER ESPANA SL
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 292 million
    EUR 584 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The operation supports solar and wind renewable energy generation projects in Spain. This is the second allocation under the Framework Loan (FL) 2020-0916, approved by the EIB Board of Directors on 22.07.2021 (CA/545/21/451).

    The aim is to contribute to achieve the EU-wide target of reaching 32% of energy from renewable sources in gross final energy consumption by 2030, as set out in the Renewable Energy Directive (EU 2018/2001). It also contributes towards the renewable energy targets outlined in the Spain's National Energy and Climate Plan (NECP). The operation is in line with both the EIB's cohesion financing and with the lending priority related to renewable energy and climate action.

    Additionnalité et impact

    This operation concerns the development and operation of a portfolio of onshore wind and solar PV projects that will contribute to the achievement of the 2030 decarbonisation targets set out in the National Energy and Climate Plan (NECP) of Spain and the REPowerEU action plan. The projects are located in two Cohesion Regions.

    The financing of this operation contributes to Bank's lending priority objectives on Renewable Energy, Environmental Sustainability, Climate Action, as well as Economic and Social Cohesion.

    The underlying projects produce electricity from low carbon sources (solar PV and on-shore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation).

    The underlying projects will rely on revenues from the wholesale market and unsubsidised commercial power purchase agreements (cPPA), thus the operation improves market efficiency and competition. The operation is expected to yield good quality and results, thanks to avoided GHG emissions and fair employment creation.

    The promoter has a recognised in-house design and project management capacity with a significant track-record of international energy projects. The project is supported by adequate governance and capabilities of the promoter. 

    The EIB's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. 

    Aspects environnementaux
    Passation des marchés

    All projects and grid interconnection infrastructure have required an Environmental Impact Assessment (EIA), including public consultation. The competent authorities considered all the comments presented during the EIA, in line with the legal framework. General quality of the Environmental Impact Studies (EIS), in terms of the impact assessment methodology, studies and fieldwork conducted is considered acceptable. The EIS of each plant and ancillary facilities such as the transmission lines included a cumulative impacts assessment taking into account the neighbouring (existing and planned) infrastructures, including the plants within the relevant cluster. The plants and associated infrastructure obtained their environmental permits (Declaracion de Impacto Ambiental - DIA) between 2018-2022. The wind cluster is in the last stage of construction, with projects already energized in December 2022 and PV schemes are currently under construction with the last plants expected to be operational by end of 2023.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

    Étapes
    Approuvé
    12 juillet 2023
    Projets associés

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - ENDESA WIND AND SOLAR SECOND ALLOCATION
    Date de publication
    19 Jul 2023
    Langue
    Sujet général
    Prêts
    Numéro du document
    169215587
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220711
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant
    Fiche d’achèvement d’un point de vue environnemental et social - ENDESA WIND AND SOLAR SECOND ALLOCATION
    Date de publication
    24 Dec 2025
    Langue
    Sujet général
    Prêts
    Numéro du document
    256893958
    Thématique du document
    Information Environnementale
    Numéro du projet
    20220711
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes