Amount
€ 250,000,000
Countries
Sector(s)
The Netherlands : € 250,000,000
Transport : € 250,000,000
Signature date(s)
17/12/2021 : € 250,000,000
Link to source

Summary sheet

Release date
9 July 2021
Status
Reference
Signed | 17/12/2021
20210401
Project name
Promoter - financial intermediary
NS RAIL ROLLING STOCK EXPANSION
NS GROEP NV
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 250 million
EUR 838 million
Location
Sector(s)
Description
Objectives

Purchase of new rolling stock for the operation of commuter, regional and main railway services within the Netherlands and Belgium.

The project is expected to improve the quality and offer of passenger rail services in the Netherlands. By supporting efficient public transport, the investment will also bring environmental benefits (reduction of emissions and noise levels), and improve transport safety.

Additionality and Impact

The Dutch rail network is Europe's busiest. The project is part of a 10 year long program to significantly upgrade NS Rail fleet and will allow to strengthen and accommodate mid-term growth and operational needs essential to a post-COVID sustainable mobility in the Netherlands.


The project generates good economic and social benefits, e.g. by reducing travel times and by offering improved quality (higher comfort, improved reliability), higher frequency, safety and better access for persons with reduced mobility.


The shift of passenger and freight traffic to rail addresses market failures by minimizing a number of transport externalities, such the harm to humans in terms of accidents and loss of life, or environmental externalities like noise, pollution and CO2 emissions.


The project will hence contribute to sustainable transport in line with EU objectives and to the Bank's Climate Action objective and supports a number of the 17 Sustainable Development Goals (SDGs) and in particular SDG 11 "Sustainable cities and communities", SDG 3 "Good health and well-being" and SDG 12 "SDG 12 "Responsible consumption and production".


The specific benefits provided by EIB's contribution to the Borrower entail a limited financial benefit as well as fully customized terms/loan profile with long tenors. This is valuable as the assets necessary for railway operations have long life and the benefits from these assets materialize over long time.

Environmental aspects
Procurement

The investments proposed under the project do not fall under either Annex I or Annex II of the Environmental Impact Assessment Directive 2011/92/EU as amended by Directive 2014/52/EU as manufacturing and use of rail rolling stock is not included in either list. The need for an environmental impact assessment (EIA) and/or assessment according to the Habitats Directive for associated facilities (e.g. maintenance workshops or depots) will be analysed during the appraisal. However, it is not expected that additional maintenance workshops or depots are needed for these trains. The project is expected to have a positive environmental impact by helping the railways to maintain and improve its modal share in key sections of the passenger market that are most appropriately met by rail. In addition, the arrangements for scrapping of replaced stock, if any, will be checked during appraisal.

The Promoter is a contracting authority regulated by public procurement law, and follows EU Directive 2014/25/EU. The trains to be financed under this project will be procured by making use of options that were included in two supply contracts that the promoter signed in 2014 and 2016 with European manufacturers. The original contracts were both procured through a negotiated procedure, with publication of tender notices in the Official Journal of the EU in 2012 and 2014, as and where required.

Link to source
Other links

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - NS RAIL ROLLING STOCK EXPANSION
Publication Date
22 Dec 2021
Document language
Main Topic
Lending
Document Number
143141941
Document Focus
Environmental Information
Project Number
20210401
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications