Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 234,769,339.12
    Countries
    Sector(s)
    Poland : € 234,769,339.12
    Energy : € 234,769,339.12
    Signature date(s)
    17/12/2019 : € 234,769,339.12
    Other links

    Summary sheet

    Release date
    23 September 2019
    Status
    Reference
    Signed | 17/12/2019
    20190433
    Project name
    Promoter - financial intermediary
    ENERGY SECURITY OF SUPPLY IN POLAND - PCI
    OPERATOR GAZOCIAGOW PRZESYLOWYCH GAZ - SYSTEM SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    PLN 1000 million (EUR 233 million)
    PLN 2178 million (EUR 507 million)
    Location
    Sector(s)
    Description
    Objectives

    The project consists of a loan contributing to increased system capacity, energy security and diversification of natural gas supplies in Poland. The investment consists of two sections: the construction of the pipeline in Central-Eastern Poland (Gustorzyn - Wronów pipeline) and the second section is the Polish section of the Poland-Slovakia interconnector.

    Projects of Common Interest (PCIs) are key infrastructure projects that have a significant impact on the energy markets and market integration in at least two EU countries and help the EU achieve its energy policy and climate objectives: affordable, secure and sustainable energy for all citizens, as well as the long-term decarbonisation of the economy. The programme objective is to improve the technical conditions of the gas transmission in Poland thus contributing to the diversification of natural gas supplies and to the national energy security, ultimately providing reliable gas supply services to the population. The interconnection is an essential part of the North-South Gas Corridor ("NSI East Gas"), which is intended to integrate gas systems of Central and Eastern European countries.

    Environmental aspects
    Procurement

    Based on its technical characteristics, each of the sub-projects falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU. The environmental approvals are being processed for the Poland-Slovakia interconnector and are planned to be obtained by 1Q 2020 for the three stages of the Gustorzyn-Wronów pipeline. Impacts that can typically be expected are mainly temporary and relate to construction works (noise, dust, increased traffic, temporary access restrictions, waste disposal). These impacts can usually be well managed by appropriate mitigation measures in order to avoid unacceptable nuisance to other parties and the public. The final pipeline routes have been selected so as to minimize the crossing of unstable areas, flooding risk areas, main groundwater bodies, Natura 2000 sites, as well as to make use of existing roads wherever possible. The EIB will further assess the environmental risks aspects of the Gustorzyn-Wronów pipeline stages and confirm their alignment with applicable EU environmental policy and regulation prior to allocating funds to this sub-project. This includes review of environmental permitting documentation and related environmental management measures.

    The EIB will require the Promoter to ensure that contracts for the implementation of the Project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU where applicable, as well as Directive 92/13/EEC), as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Related documents
    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI - Raport o oddziaływaniu na środowisko
    Publication Date
    13 Nov 2019
    Document language
    Main Topic
    Lending
    Document Number
    122822412
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI - Streszczenie w Języku Niespecjalistycznym
    Publication Date
    13 Nov 2019
    Document language
    Main Topic
    Lending
    Document Number
    115420405
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI
    Publication Date
    17 Dec 2019
    Document language
    Main Topic
    Lending
    Document Number
    109450739
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI - Raport o oddziaływaniu na środowisko: Budowa gazociągu DN 1000 Gustorzyn – Wronów, Etap II Leśniewice-Rawa Mazowiecka
    Publication Date
    26 Aug 2020
    Document language
    Main Topic
    Lending
    Document Number
    130130676
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI - Raport o oddziaływaniu na środowisko: Budowa gazociągu w/c DN 1000 MOP 8,4 MPa Gustorzyn – Wronów Etap III
    Publication Date
    26 Aug 2020
    Document language
    Main Topic
    Lending
    Document Number
    130127843
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENERGY SECURITY OF SUPPLY IN POLAND - PCI - Raport o oddziaływaniu na środowisko: Budowa gazociągu DN 1000 Gustorzyn – Wronów, Etap I Gustorzyn - Leśniewice
    Publication Date
    26 Aug 2020
    Document language
    Main Topic
    Lending
    Document Number
    130126032
    Document Focus
    Environmental Information
    Project Number
    20190433
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Link to source

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications