Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 550,000,000
    Countries
    Sector(s)
    Belgium : € 550,000,000
    Energy : € 550,000,000
    Signature date(s)
    15/03/2018 : € 250,000,000
    1/12/2017 : € 300,000,000

    Summary sheet

    Release date
    21 August 2017
    Status
    Reference
    Signed | 01/12/2017
    20170343
    Project name
    Promoter - financial intermediary
    WALLOON REGION ENERGY GRIDS UPGRADE (ORES)
    ORES ASSETS
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 550 million
    EUR 1226 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The operation involves a EUR 550m loan to ORES, the distribution service operator for electricity and gas networks covering 75% of the Walloon region in Belgium. ORES will invest over EUR 1.15bn in the period 2018-2022 to upgrade and extend its gas and electricity networks.

    In addition to maintaining current gas and electricity network security standards in compliance with the latest regulation, the project is expected to result in an overall increase of reliability and to enable the connection of additional renewable generation capacity. Eventually, the project is expected to contribute to growth and employment in the region.

    Environmental aspects
    Procurement

    The project includes facilities that fall under Annex II of the EIA Directive (2011/92/EU), which requires the competent national authority to determine the need for an Environmental Impact Assessment (EIA). The impacts that can be typically expected for some schemes relate to visual impact, impact on flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC).

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directives 2014/23/EU, 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directives 92/13/EEC (amended 2007/66/EU) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - WALLOON REGION ENERGY GRIDS UPGRADE (ORES)
    Publication Date
    15 Jan 2018
    Document language
    Main Topic
    Lending
    Document Number
    78548462
    Document Focus
    Environmental Information
    Project Number
    20170343
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications