Amount
€ 120,000,000
Countries
Sector(s)
Poland : € 120,000,000
Energy : € 120,000,000
Signature date(s)
21/12/2011 : € 120,000,000
Link to source

Summary sheet

Release date
6 May 2011
Status
Reference
Signed | 21/12/2011
20100620
Project name
Promoter - financial intermediary
Polaniec Biomass Powerplant
Private company
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 120 million
EUR 240 million
Location
Sector(s)
Description
Objectives

The project concerns the replacement of a coal-fired boiler in an existing power plant in Poland with a new fluidised-bed boiler designed to combust 100% biomass. The existing steam turbine and generator will be refurbished and allow the production of around 200 MWe.

The project will promote the development of a power system in a convergence region. It will contribute to meeting electricity demand using a renewable source within the national Polish market dominated, for more than 90%, by coal fired power plants. The use of forest and agricultural biomass should contribute to diversification of fuel and electricity supply and hence increase security of supply. The project is therefore eligible under article 309 a) Economic and Social Cohesion, and c) Common Interest of the Treaty on the Functioning of the European Union. The financing of this project will contribute to the Bank’s lending priority policy on convergence regions, diversification and security of energy supply and renewable energy.

Environmental aspects
Procurement

Due to its capacity (plant over 300 MWth), the project is subject to the Annex I of the EIA Directive (85/337/EC and amendments) and was required to undergo a full Environmental Impact Assessment (EIA). The 2010 EIA study found the project’s impact on environment acceptable and the environmental permit was granted by the competent authorities. The project is a brown field investment and its net environmental impact is positive due to the elimination of coal combustion unit.

The promoter is not a public undertaking in the sense of the Art. 2.1(b) of the new Utilities Directive 2004/17/EC. It is also not enjoying any special or exclusive rights as the Polish electricity sector legislation allows private and public power generation companies to have equal access to the high-voltage network on objective terms. Therefore, the promoter is not subject to the Directive 2004/17/EC addressing procurement in the utilities sector. Nevertheless, the promoter employs a competitive system of tendering and bid evaluation.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

Related publications