Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20230337
    Veröffentlichungsdatum: 22 Januar 2024

    Projektträger – zwischengeschaltetes Finanzinstitut

    FNM SPA

    Ort

    Beschreibung

    The project consists of the acquisition of 14 hydrogen-powered trainsets for passenger services on the Brescia - Edolo railway line and of around 40 hydrogen buses for services on several routes in Lombardy, construction of a new rail rolling stock maintenance depot in Rovato, construction of hydrogen production and storage facilities in Brescia, Iseo and Edolo, hydrogen refuelling stations for trains and buses, as well as for road light and heavy duty vehicles, other associated works and installation.

    Ziele

    The aim is to contribute to the decarbonisation of rail, public transport and road transport in Lombardy, which is expected to increase the quality of rail and public transport services as well as promote travel by rail, reduce the usage of private vehicles and the associated negative impacts on the local environment and road safety. The project will also contribute to the deployment of alternative fuels infrastructure along the Trans-European Transport Network (TEN-T). It will thus contribute to reduction of pollution and greenhouse emissions and, thereby, contribute to the sustainable transport in line with EU objectives.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 165 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 460 million

    Umweltaspekte

    The acquisition of rail rolling stock and buses does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive. The conformity of the rail rolling stock with the TSIs concerning noise and accessibility for persons with disabilities and persons with reduced mobility will be analysed at the appraisal. In addition, the arrangements for the scrapping of the replaced stock will be checked during appraisal. The need of EIA and/or assessment according to the Habitats Directive for the maintenance depot and hydrogen production, storage and distribution installations, as well as conformity of the hydrogen installations with Directive 2012/18/EU (Seveso III) and Directive 2010/75/EU (Industrial Emissions) will be analysed during the appraisal.

    Auftragsvergabe

    The promoter to ensure that contracts for implementation of the project have been and/or will be tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    In Prüfung - 13/12/2023

    Milestone
    In Prüfung

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Verkehr