Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20220679
    Veröffentlichungsdatum: 30 November 2022

    Projektträger – zwischengeschaltetes Finanzinstitut

    UNICREDIT BULBANK AD

    Ort

    Beschreibung

    Operation supporting mid-caps in Bulgaria in sectors which are in line with the EIB's long-term mission.

    Additionality and Impact

    This Linked risk sharing operation is designed to provide support to mid-caps in order to foster access to liquidity and contribute to long-term economic growth in Bulgaria. The operation addresses the underlying market failure in access to finance faced by Final Beneficiaries due to information asymmetries and credit considerations on the side of the Financial Intermediaries. Given the economic uncertainty exacerbated by supply chain constraints, inflation, rising interest rates, energy security constraints and the lasting effects of the pandemic the proposed risk sharing operation may alleviate some of the pressures faced by the real economy. The EIB contribution enables UniCredit Bulbank to reach beneficiaries that are not covered by any of the existing guarantee schemes currently available in Bulgaria. The EIB contribution rests on assuming credit risks and thereby allowing the Financial Intermediary to engage into transactions that it would not have engaged in without the EIB's intervention due to for example capital or credit risk related limitations. The final benficiaries will benefit from the above additional lending made available by UniCredit Bulbank at typically beneficial terms, in the form of reduced interest rates, longer maturities and/or lower collateral requirements.

    Ziele

    Linked risk sharing operation in support of Bulgarian mid-caps in sectors that are in line with the EIB's long-term mission (innovation, environment and indirect support for small and medium-sized enterprises).

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 280 million

    Umweltaspekte

    Final beneficiaries will be requested to comply with applicable national and EU environment and procurement legislation, as appropriate.

    Auftragsvergabe

    Final beneficiaries will be requested to comply with applicable national and EU environment and procurement legislation, as appropriate.

    Projektstatus

    Unterzeichnet - 22/12/2022

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    7 Dezember 2022
    22 Dezember 2022

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Bulgarien Durchleitungsdarlehen