Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20150041
    Veröffentlichungsdatum: 15 Juni 2015

    Projektträger – zwischengeschaltetes Finanzinstitut

    Hungary represented by the Ministery for National Development

    Ort

    Beschreibung

    The railway section Szajol-Püspökladány is part of the main line No. 100 Budapest-Szolnok-Debrecen-Nyíregyháza-Záhony (transhipment facility at the Slovak/Ukrainian border). The project mainly concerns the rehabilitation of the existing double track (67.15 km) and the renewal of the catenary and of the signalling and telecommunications equipment.

    Ziele

    The project contributes to the objective of promoting sustainable transport on the TEN-T core and comprehensive networks, with an expected increase in rail usage thanks to a shift from road to railways.

    Kommentar(e)

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    HUF 18700 million (EUR 61 million)

    Gesamtkosten (voraussichtlicher Betrag)

    HUF 125300 million (EUR 406 million)

    Umweltaspekte

    The investments are part of the transport operational programme 2007-2013, which underwent an SEA procedure and the environmental effects were assessed. Given the nature of the project, it falls under Annex II of the EIA Directive (2011/92/EU) and the need for an EIA must be verified at the time of allocation. For this major project, a preliminary environmental impact assessment was performed. On the basis of the findings of this assessment, the competent authorities require a full EIA for the Szajol-Püspökladány reconstruction. The environmental permit has been issued for the project, which is not expected to have any impact on Natura 2000 sites.

    Auftragsvergabe

    The promoter is a public company obliged to comply with European and national public procurement legislation. All of the works and services related to the implementation of the project have already been procured accordingly. The construction works and associated supervision were procured by the promoter in accordance with Directive 2004/18/EC. All tender notices for construction and services were published in the Official Journal of the European Union (OJEU) and all the contracts have been awarded.

    Projektstatus

    Genehmigt - 31/10/2014

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Ungarn Verkehr