Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20110166
    Veröffentlichungsdatum: 10 Juni 2011

    Projektträger – zwischengeschaltetes Finanzinstitut

    Syndicat des Transports d'Ile de France.

    Ort

    Beschreibung

    Construction of four new tram lines (T5, T6, T7 and T8) to serve the municipalities of the first ring of suburbs around Paris and purchase of rolling stock.

    Ziele

    The project is designed to improve the quality of public transport, encourage a switch to soft modes of transport and reduce the use of private cars.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 600 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 1 687 million.

    Umweltaspekte

    The tram lines come under Annex II of Directive 85/337/EEC amended and have been subjected to an impact assessment under the Declaration of Public Utility procedure. They are also included in the Master Plan for the Île-de-France Region currently being approved and have been subjected to a strategic environmental assessment. The lines pass through urban areas and are unlikely to have significant impacts on Natura 2000 conservation sites. Line T6 includes a 1.6 km underground section under the forest of Meudon, which features on the French list of natural areas of ecological, fauna and flora interest but is not considered a Natura 2000 site. The construction of the tram line in a tunnel will minimise the impact on the forest. Given the project's virtuous objectives, and apart from certain temporary negative effects during the construction phase, the overall environmental impact can only be positive.

    Auftragsvergabe

    Tram lines in Île-de-France are currently operated by RATP under a concession contract signed with STIF. Most of the procurement has been carried out by RATP in its capacity as delegated contracting authority for the transport system using competitive tendering (notice in the Official Journal of the European Union). The procedures adopted comply with current regulations.

    Projektstatus

    Unterzeichnet - 4/10/2011

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Frankreich Verkehr