Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090678
    Veröffentlichungsdatum: 10 Dezember 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Republic of Turkey, represented through DLH, - the relevant body of the Transportation Ministry

    Ort

    Beschreibung

    The project is a PPP for the the design, financing, construction, operation and maintenance of the Istanbul Strait Road Tunnel Crossing, comprising three sections with a total length of 14.6 km. The two road sections on either side of the tunnel shall be returned to the public authorities immediately after the completion of construction while the tunnel section shall be operated under a concession.

    Ziele

    Protection of Environment and Sustainable Communities
    Support to Pre-accession countries

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Approximately EUR 250 million (to be appraised)

    Gesamtkosten (voraussichtlicher Betrag)

    Approximately EUR 768 million (to be appraised)

    Umweltaspekte

    If within the EU, the project would fall under Annex I of the EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC thus requiring a full EIA, including public consultation.

    Auftragsvergabe

    The project has been tendered by the Turkish State (via DLH) as a BOT for the design, building, financing, operating of the “Istanbul Strait Road Tube Crossing”, and has received widespread international interest. Tender has been awarded with a concession period of 30.5 years at the end of 2008 to a Turkish-Korean J.V., and the contract is currently being finalised for signature. Procurement procedures followed are deemed satisfactory by the Bank.

    Projektstatus

    Unterzeichnet - 8/12/2012

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Türkei Verkehr