Veröffentlichungsdatum: 8 Juni 2009
Projektträger – zwischengeschaltetes Finanzinstitut
ZON Multimédia – Serviços de Telecomunicações e Multimédia SGPS, S.A.
Ort
Beschreibung
The project is the first phase of roll out by the promoter of a Next Generation Access network to offer advanced high speed broadband services in competition with the incumbent fixed line operator.
Ziele
The project contributes to the policy objective of furthering the “Information Society” through the modernisation of fixed telecommunications infrastructure, a key platform for the provision of advanced broadband services.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 100 million.
Gesamtkosten (voraussichtlicher Betrag)
Currently estimated at EUR 307 million.
Umweltaspekte
The project will have a minor impact on the environment. The fibre optical cable will be installed inside existing duct infrastructure as far as possible. Electronic equipment will be installed inside the promoter’s existing office-type buildings and street cabinets and the network terminations at customer premises.
Auftragsvergabe
Telecommunications have been excluded from the scope of the EU Directive controlling the procurement of utilities. The procurement procedures followed by this private sector promoter and the costs of main project components will be assessed during appraisal.
Projektstatus
Unterzeichnet - 28/09/2009
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).