Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20090176
    Veröffentlichungsdatum: 10 August 2009

    Projektträger – zwischengeschaltetes Finanzinstitut

    Sincrotrone Trieste SCPA

    Ort

    Beschreibung

    The project relates to the second phase of the FERMI@Elettra Free Electron Laser project, i.e. FEL-2 and concerns additional investments necessary to attain shorter wavelengths to facilitate molecular research on carbon- and oxygen- atomic level, study living tissues, and study the transition of, or magnetism in materials. In addition, the project envisages the construction of a tri-generation plant combining normal energy, valorisation of waste energy, and the use of solar panels and other sources of renewable energy. 

    Ziele

    The objective of the tri-generation plant is the valorisation of waste energy of Sincrotrone Trieste’s operations, and, with the use of solar panels and other sources of renewable energy, to make  Sicrotrone Trieste “carbon neutral”.

    Kommentar(e)

    The project is eligible under the Risk Sharing Finance Facility (RSFF). The Risk Sharing Finance Facility (RSFF) is an innovative credit risk sharing scheme jointly set up by the European Commission and the Euroepan Investment Bank to improve access to debt financing for private companies or public institutions promoting activities with a higher financial risk profile in the fields of research, technological development, demonstration and innovation investments.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 20 million.

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 40 million.

    Umweltaspekte

    This project consists of two sub-projects. The first encompasses technical modifications to the Sincrotrone Trieste project, which was appraised by the Bank in 2004. This project was considered to fall outside both Annex I or II of Directive 97/11/EC and will not affect any Natura 2000 site. Regarding the second sub-project, the construction of the tri-generation, the decision and determination of the competent authorities as to whether an EIA will be required will be verified during the appraisal.

    Auftragsvergabe

    Sincrotrone Trieste S.C.p.A is a not-for-profit, public share company/consortium of national Interest owned by diverse public bodies. As such, the promoter follows the procurement directives relevant to the public sector.

    Projektstatus

    Unterzeichnet - 29/04/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Italien Dienstleistungen