    Referenz: 20080527
    Veröffentlichungsdatum: 30 Juli 2010

    Projektträger – zwischengeschaltetes Finanzinstitut

    Tanger Med Port Authority (TMPA), a subsidiary of TMSA, Tanger Méditerranée Special Agency (TMSA), a fully state-owned company.

    Ort

    Beschreibung

    The project consists of the infrastructure of the Tanger Med II port, a major expansion of Tanger Med port complex. The project facilities will include two new breakwaters and two new container terminals, with an additional capacity of 5 m TEUs p.a.

    Ziele

    Raising the total Tanger Med Port’s capacity to 8 million TEUs and making it the largest transhipment port around the Mediterranean Sea.

    Kommentar(e)

    The project will facilitate traffic flows between the Mediterranean region and markets on both sides of the Atlantic and Asia. It will also provide additional capacity for Moroccan international trade and will foster local economic development. By providing maritime transport infrastructure, the project will contribute to FEMIP objective to create an enabling environment for the development of the private sector.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 200 million.

    Gesamtkosten (voraussichtlicher Betrag)

    The total project costs are estimated at about EUR 800 million, to be confirmed during appraisal. The Bank’s contribution to the financing will not exceed the usual proportion for this type of project.

    Umweltaspekte

    If within the EU, the Project would fall under Annex I of the EIA Directive and would require a full EIA. Following an integrated environmental impact study (EIS) covering the whole Tanger Méditerranée programme, an EIA process in accordance with Moroccan legislation has been carried out, including preparation of an environmental impact study and management plan. The final environmental consent has yet to be issued. Information and communication meetings were held at institutional level with the main project stakeholders.

    EIA process, biodiversity assessment requirements, social impact; environmental/social mitigating measures and public consultation will be checked during appraisal.

    Auftragsvergabe

    The Bank will require the Promoter to ensure that implementation of the project will be done in compliance with the Bank’s Guide to Procurement. The project procurement plan and procedures will be reviewed during appraisal.

    Projektstatus

    Unterzeichnet - 11/11/2010

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).