Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20060080
    Veröffentlichungsdatum: 4 April 2006

    Projektträger – zwischengeschaltetes Finanzinstitut

    Bord Gáis Éireann

    Ort

    Beschreibung

    Development of gas transmission and distribution networks in Ireland and Northern Ireland.

    Ziele

    To enhance security of gas supply to Northern Ireland by interconnecting its gas transmission system with Ireland, to facilitate gas supplies to new industrial and residential customers in Ireland and Northern Ireland and to increase gas network safety standards.

    Kommentar(e)

    Electricity, gas and water supply

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    Up to EUR 250 million

    Gesamtkosten (voraussichtlicher Betrag)

    About EUR 570 million

    Umweltaspekte

    Gas transmission interconnector falls under Annex II of the Environmental Impact Assessment directive (85/337/EEC as amended by 97/11/EC). A full EIA including extensive public consultation was carried out as part of the statutory requirements for planning application. The EIA and the proposed mitigating and monitoring measures will be reviewed in detail during appraisal as well as the risk analysis and the promoter's operating safety policies.

    Any negative environment impact resulting from the extension/renewal of the gas distribution networks in urban areas is expected to be minimal and limited to the construction period.

    Auftragsvergabe

    All of the main civil works, equipment supply and services contracts have been or will be advertised in the Official Journal of the European Communities and tendered via negotiated procedures. These procedures are in line with the relevant EU legislation and are considered appropriate for the project.

    Projektstatus

    Unterzeichnet - 11/12/2006

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Irland Energie