Veröffentlichungsdatum: 27 Februar 2006
Projektträger – zwischengeschaltetes Finanzinstitut
JYRO SY RANO MALAGASY (JIRAMA)Ort
Beschreibung
The project consists of the construction of production infrastructure (groundwater abstraction) aimed at increasing the available quantity of water to guarantee supplies to the greater Antananarivo area until 2015. It includes the upgrading and expansion of the network with mains and supply pipelines and its extension into outlying areas not currently served.
Ziele
To diversify supply sources and improve water provision infrastructure in order to curb the deterioration in the service provided to households already covered and create the extra capacity needed to serve a further 500 000 people, 75% of whom are located in the poorest outlying areas of the city.
Sektor(en)
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
EUR 23.5 million.
Gesamtkosten (voraussichtlicher Betrag)
EUR 47 million.
Umweltaspekte
The July 2003 Master Plan contained a favourable opinion on the project's feasibility. A more detailed study on the environmental impact and the protection of new water resources will be undertaken during the project's preparatory phase in parallel with the geophysical prospecting.
Auftragsvergabe
Most of the calls for tender will follow international tendering procedures.
Projektstatus
Unterzeichnet - 19/03/2008
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).